Progress Update on Market Street Loughborough: Plumbing, Electrics, and Plastering Advancements
- Natalie

- 14 minutes ago
- 2 min read
The transformation of Market Street in Loughborough is not just a vision; it’s becoming a reality. As we dive deeper into our renovation project, we are delighted to share the latest updates surrounding plumbing, electrics, and plastering. Over the past month, our team has made remarkable strides, and this report will give you a clear picture of our progress and what’s next.
1st Fix Plumbing and Electrics Completed
The first fix for plumbing and electrics is a pivotal stage in any renovation. During this phase, essential systems for water and electricity are embedded within the walls. metres
In the last month, our expert team successfully completed this crucial installation. For instance, we installed more than 500 metres of piping and over 1,200 metres of electrical wiring. This extensive groundwork means we are laying a strong foundation for a fully operational building.
Completing this phase not only fortifies the infrastructure but also sets us up to advance with the subsequent renovation stages.
Wall Boarding and Insulation
After wrapping up the first fix, we shifted our focus to the walls. By boarding them up, we created a robust base for future interior design.
Furthermore, the installation of insulation in walls and ceilings is critical for enhancing energy efficiency. Effective insulation plays a key role in maintaining comfortable temperatures, which is essential considering that energy usage accounts for about 30% of a building’s expenses.
We also insulated and boarded up the external walls, bolstering energy efficiency even further. This attention to detail is crucial for sustainability and effectively cuts long-term energy costs.

Progress in Plastering
With walls and ceilings now prepared, we are pleased to report significant advancements in the plastering process. Plastering not only results in a smooth finish but also elevates the overall look of the space, which is crucial for attracting future tenants.
Our team has been diligently applying plaster to ensure every inch meets high standards. This requires a keen eye for detail and a steady hand—an effort that is evident in the quality of the work being produced.
As plastering continues, the change in the interior is striking. The bare walls are rapidly evolving, creating a promising blank canvas for upcoming design elements.

Looking Ahead
The renovation of Market Street in Loughborough is progressing smoothly, with substantial advancements in plumbing, electrics, and plastering. The successful completion of the first fix, along with wall boarding and insulation, has fortified our groundwork.
As we press on, our dedication to delivering a high-quality environment tailored to future tenants ensures a vibrant atmosphere. We are eager to share more updates in the coming weeks.
Thank you for your ongoing interest in our project!